Live Projects

Real Projects, Real Power —Mali, West Africa

Five projects running 24/7 —designed, delivered and commissioned by Deepoint engineers on-site.

5
Projects delivered
318 kW
Total power
590 kWh
Storage capacity
99.98%
Uptime
Mali Telecom Center —Deye inverters Mali Telecom Center —solar array Mali Telecom Center —installation Mali Telecom Center —completed
Case 1 — Telecom

Telecom Center — 24 kW off-grid backup

📍 Mali, West Africa · 2025

Challenge

The telecom center suffered grid outages of 6–10 hours per day, putting voice and data services at risk for 200,000+ subscribers. Diesel genset OPEX was running at $4,200/month.

Solution

Hybrid system with 2× Deye SUN-12K-SG04LP3-EU inverters and 40 kWh of Deye BOS-G LiFePO₄batteries, N+1 redundancy, <20 ms automatic switchover.

Result

Uptime jumped to 99.98%. Energy cost cut by 73%. Projected ROI in 2.4 years. Zero outages since commissioning.

InverterDeye 12 kW × 2
Battery40 kWh LiFePO₄/span>
TypeOff-Grid Backup
Year2025
▶ Video
Case 2 — Residential

Zanzibar Villa — 6 kW Off-Grid Residential PV

📍 Zanzibar, Tanzania · 2025

Challenge

Private villa with no reliable grid access, requiring a clean and fully independent energy supply.

Solution

6 kW off-grid Residential PV System with 620 W solar panels, delivering complete energy autonomy.

Result

100% solar-powered villa — silent, clean energy with zero fuel costs.

System6 kW Off-Grid
Solar Panel620 W
TypeResidential PV
Year2025
▶ Video
Case 3 — Healthcare

Bamako Hospital — 50 kW critical backup

📍 Bamako, Mali · 2025

Challenge

Operating theatres and vaccine cold-chain rooms were exposed to micro-outages —a direct threat to patients and stocked vaccines.

Solution

50 kW hybrid system + 150 kWh LiFePO₄storage with UPS-grade zero-gap switchover and 24/7 remote monitoring.

Result

Zero power-related incidents in 9 months. Diesel costs down by $38,000/year. Cold-chain temperature audit passed.

Inverter50 kW
Battery150 kWh LiFePO₄/span>
TypeCritical Backup
Year2025
Mali Police HQ —ESS installation Mali Police HQ —Deye BOS-G battery rack Mali Police HQ —inverter room
Case 4 — Government

Bamako Police HQ — 100 kW critical infrastructure

📍 Bamako, Mali · 2025

Challenge

Command center, radio room and sensitive servers depended on an unstable national grid.

Solution

100 kW Deye three-phase + 200 kWh Deye BOS-G rack ESS, full N+1 redundancy.

Result

24/7 continuity guaranteed. Saving over $90,000/year. Model now replicated across 3 other government buildings.

Inverter100 kW
Battery200 kWh LiFePO₄/span>
TypeCritical Infrastructure
Year2025
▶ Video
Case 5 — Finance

Bank Data Center — 100 kW + 200 kWh

📍 Bamako, Mali · 2025

Challenge

Tier-2 bank data center demanding 100% uptime for core banking and ATM network.

Solution

100 kW Deye + 200 kWh BOS-G, dual DC bus architecture, Tier-2 grade monitoring.

Result

Zero incidents in 6 months. Compliance audit passed. Energy costs down 64%.

Inverter100 kW
Battery200 kWh LiFePO₄/span>
TypeData Centre Backup
Year2025
Delivery Process

From inquiry to live system in 4 steps

Inquiry & Survey

24h response. Load study, site audit, detailed BOM.

System Design

Single-line diagram, component selection, customer sign-off.

Factory-Direct Delivery

Direct ex-factory shipment, customs clearance, on-site delivery.

On-site Commissioning

Installation, start-up, training of your local team.